Deadline: 12 May 2022
The Public Utilities Regulatory Commission (PURC) is seeking (an) Independent Power Producer(s)
(IPP) with the ability, technical skills and capacity, financial and other relevant resources to
construct, install and operate its own Solar PV facility or any other form of renewable energy source
with relevant guidance and oversight by the Commission and the Network Licensee, GRENLEC.
The proposed distributed Generation facility/ies will be of fixed capacity sizes up to and including
200kW and result in a total accumulated capacity of 2 MW.
The Commission invites potential Independent Power Producers with specific generation projects to
participate in a selective tender for a specified maximum generation capacity.